Home > Store > Construction & Maintenance >

Pipeline Maintenance Level 3 Trainee Guide, 3rd Edition

Pipeline Maintenance Level 3 Trainee Guide, 3rd EditionPhysical Product
  • By . NCCER
  • Pub. Date: May 3, 2017 by Pearson.
  • ISBN-10: 0-13-471652-3
  • ISBN-13: 978-0-13-471652-7

Student/Retail Price: $133.33

Institutional/Business Price: $100.00

  • Description

This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes:


CT14_1-17 Locate Line

CT14_2-17 Install, Inspect, and Maintain Permanent Marker
CT14_5-17 Install, Inspect, and Maintain Temporary Marker

CT29_1-17 Launching In-Line Inspection Devices

CT29_2-17 Receiving In-Line Inspection Devices

CT33_1-17 Determine Allowable Line Pressure in Section to be Moved

CT33_3-17 Moving In-Service Pipeline

CT36_2-17 Purging of Pipeline Facilities

CT36_3-17 Sealing a Disconnected Portion of Pipeline

CT38_3-17 Visually Inspect that Welds Meet DOT Requirements (API 1104)

CT40_3-17 Apply Composite Sleeve

CT40_4-17 Install Mechanical Bolt-On Split Repair Sleeve

CT40_5-17 Install Weldable Compression Couplings

CT40_6-17 Install and Remove Plugging Machine

CT40_7-17 Installing a Tap 2 Inches and Under on a Pipeline System

CT40_8-17 Installing a Tap Larger Than 2 Inches on a Pipeline System

CT40_9-17 Install and Remove Completion Plug on Pipelines Larger than 2 Inches

CT41_0-17 Conduct Pressure Test

CT42_7-17 Welding


Instructor Supplements


Instructors: Product supplements may be ordered via our ordering department at 1-800-922-0579 or directly through OASIS at http://oasis.pearson.com.


Instructor Access Card Provides access to PowerPoints, Lesson Plans and Performance Profile sheets


Instructor's Resource Card  ISBN: 9780134716558   


Price $100

Product Type: Physical Product

Add To Cart

In stock. Usually ships in 24 hours.

Individual Modules for this title also available separately

CT14 1-17 Locate Line Trainee Guide, 2nd Edition
CT14 1-17 Locate Line Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT14 2-17 Install, Inspect, and Maintain Permanent Marker Trainee Guide, 2nd Edition
CT14 2-17 Install, Inspect, and Maintain Permanent Marker Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT14 5-17 Install, Inspect, and Maintain Temporary Marker Trainee Guide, 2nd Edition
CT14 5-17 Install, Inspect, and Maintain Temporary Marker Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT29 1-17 Launching In-Line Inspection Devices Trainee Guide, 2nd Edition
CT29 1-17 Launching In-Line Inspection Devices Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT29 2-17 Receiving In-Line Inspection Devices Trainee Guide, 2nd Edition
CT29 2-17 Receiving In-Line Inspection Devices Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT33 1-17 Determine Allowable Line Pressure in Section to be Moved Trainee Guide, 2nd Edition
CT33 1-17 Determine Allowable Line Pressure in Section to be Moved Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT33 2-17 Preparation for Movement Activities Trainee Guide, 2nd Edition
CT33 2-17 Preparation for Movement Activities Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT33 3-17 Moving In-Service Pipeline Trainee Guide, 2nd Edition
CT33 3-17 Moving In-Service Pipeline Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT36 1-17 Safe Disconnect of Pipeline Facilities Trainee Guide, 2nd Edition
CT36 1-17 Safe Disconnect of Pipeline Facilities Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT36 2-17 Purging of Pipeline Facilities Trainee Guide, 2nd Edition
CT36 2-17 Purging of Pipeline Facilities Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT36 3-17 Sealing a Disconnected Portion of Pipeline Trainee Guide, 2nd Edition
CT36 3-17 Sealing a Disconnected Portion of Pipeline Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT38 3-17 Visually Inspect that Welds Meet DOT Requirements Trainee Guide, 2nd Edition
CT38 3-17 Visually Inspect that Welds Meet DOT Requirements Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 1-17 Fit Full Encirclement Welded Split Sleeve (Oversleeve, Tight Fighting Sleeve, etc.) Trainee Guide, 2nd Edition
CT40 1-17 Fit Full Encirclement Welded Split Sleeve (Oversleeve, Tight Fighting Sleeve, etc.) Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 3-17 Apply Composite Sleeve Trainee Guide, 2nd Edition
CT40 3-17 Apply Composite Sleeve Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 4-17 Install Mechanical Bolt-On Split Repair Sleeve Trainee Guide, 2nd Edition
CT40 4-17 Install Mechanical Bolt-On Split Repair Sleeve Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 5-17 Install Weldable Compression Couplings Trainee Guide, 2nd Edition
CT40 5-17 Install Weldable Compression Couplings Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 6-17 Install and Remove Plugging Machine Trainee Guide, 2nd Edition
CT40 6-17 Install and Remove Plugging Machine Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 7-17 Installing a Tap 2 Inches and Under on a Pipeline System Trainee Guide, 2nd Edition
CT40 7-17 Installing a Tap 2 Inches and Under on a Pipeline System Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 8-17 Installing a Tap Larger Than 2 Inches on a Pipeline Trainee Guide, 2nd Edition
CT40 8-17 Installing a Tap Larger Than 2 Inches on a Pipeline Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT40 9-17 Install and Remove Completion Plug on Pipelines Larger than 2 Inches Trainee Guide, 2nd Edition
CT40 9-17 Install and Remove Completion Plug on Pipelines Larger than 2 Inches Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT41 0-17 Conduct Pressure Test Trainee Guide, 2nd Edition
CT41 0-17 Conduct Pressure Test Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
CT42 7-17 Welding Trainee Guide, 2nd Edition
CT42 7-17 Welding Trainee Guide, 2nd Edition
By . NCCER
Jan 10, 2018
Always Learning